|
Ethiopia Training Modules
Module 1: Introduction
Module 2: Institutions
MODULE 3 - LIVELIHOODS AND PCP DEVELOPMENT
3.1 Participatory Design
3.2 Development of Farmer Organizations
3.3 Community Contracts
3.4 Drinking Water Ponds in Spate Irrigation Systems
3.5 Drinking Water from Dry Riverbeds
3.6 Project Case Study WUA Development
3.7 Project Case Study Livelihood Improvement
Module 4: Soil and Water Management
Module 5: Agronomy
Module 6: Engineering
Module 7: SWAM Model
|